KTI-PLERSCH冷卻系統(tǒng)  
武田機(jī)電 | 產(chǎn)品目錄 | 聯(lián)系我們
  上海武田機(jī)電,總部設(shè)在上海,在香港,德國(guó),美國(guó),日本均設(shè)有分公司,擁有良好的購(gòu)銷渠道,歡迎來(lái)電咨詢 TEL:0086-21-51085793
         
 

德國(guó)機(jī)械 美國(guó)機(jī)械 日本機(jī)械


國(guó)際工業(yè)裝備采購(gòu)中心


上海武田機(jī)電公司,是專業(yè)的歐美及日韓進(jìn)口工業(yè)產(chǎn)品提供商。在歐洲,美國(guó),日本及韓國(guó)擁有良好的渠道與深厚的關(guān)系,代理及經(jīng)營(yíng)多種品牌工業(yè)產(chǎn)品,歡迎選購(gòu)。

   

武田機(jī)電

KTI-PLERSCH冷卻系統(tǒng)

In general each concrete cooling system for dam construction and for mass concrete consists of the following components: ? Water Chilling Plant for the total amount of mixing water ? Cold Water Tank with Pumping Station ? Flake Ice Plant ? Flake Ice Storage with fully-automatic Ice Rake and Discharge System ? Flake Ice Delivery ? Flake Ice Weighing ? Aggregate Cooling System ? Post-Cooling of the concrete Of course, there are always different options available for each component. Concrete Mixing Temperature as function of water temperature and addition of ice respectively Temperature-Controlled Concrete Supplying temperature-controlled concrete for the construction of large dams is a must all over the world. The development of the strength inconcrete is accompanied by evolution of heat as the cement cures and hardens (heat of hydration). In small structures this phenomenon is not of importance, but very significant in mass concrete especially for dam projects. The heat of hydration raises the temperature during the curing process by up to 25° causing an increase of volume. After the curing the concrete cools down again reducing its volume and thus naturally causing cracks eventually. Therefore the initial pouring temperature should be lowered so much that the maximum temperature during the curing process does not exceed a certain temperature determined by the consultants. Even though the required pouring temperatures of the concrete vary from site to site and from country to country (from +7°C to max. 15°C) there is always a requirement for a sophisticated refrigeration system. As the initial and the running costs for such a refrigeration system are quite high (they even can be higher than the ones of the concrete batching plant itself) it is essential for the contractor to have an optimised system installed.

 
  香港及海外業(yè)務(wù):  00852-27828783 傳真:00852-30119987
中國(guó)大陸地區(qū)業(yè)務(wù):021-51085793  傳真:021-51086107   電郵:sales@fcws.biz
     
a亚洲Va欧美va国产综合,永久免费AV无码网站yy,精品成人Av一区二区三区,少妇的渴望HD高清在线播放 庆城县| 顺义区| 牟定县| 吴旗县| 江口县| 永州市| 浦东新区| 勃利县| 元阳县| 启东市| 南昌市| 湖口县| 调兵山市| 无为县| 墨江| 惠东县| 郑州市| 突泉县| 巨野县| 邛崃市| 台江县| 松滋市| 库车县| 五家渠市| 朝阳县| 曲阳县| 镇远县| 阿拉善左旗| 通化县| 依兰县| 广西| 兰考县| 绵阳市| 屯门区| 固阳县| 北宁市| 抚宁县| 呼玛县| 威远县| 卢湾区| 定陶县|